Pavel Shiryaev, 06/22/2012 11:52 AM


2012-04

Таблица за последние две недели

01.06.2012   TE   1   Observe mysocials-testing for developing of libraries // Unusable, only for new libraries.
01.06.2012   TE   1   Testing perfomance on symbian // In progress, problems with memory (on audio page)
01.06.2012   CO  0,5  Added skipped icons frome theme // Done
01.06.2012   CO   2   Fixed qml SheetButtons on symbian // Rewrited to simple Buttons
01.06.2012   CO   2   Fixed qml pages for audio player // Adapted for symbian
04.06.2012   TE   1   Testing separate installation (two sis packages) // Works with one UID, but forbidden via OVI
04.06.2012   TM   2   Searching methods of installing parts of Musson with different UIDs // In progress
06.06.2012   TM   1   Searching methods of installing SIS packages via over application // In progress
08.06.2012   CO   1   Starded porting flickr driver // In progress
13.06.2012   CO   5   Porting flickr driver // In progress. Need resolve problems with xslt
14.06.2012   CO   4   Fixing parser.xsl for avoid segfault on qt4.7.4 // Done.
14.06.2012   CO   2   Solving problem with authorization // In progress. Webauth started, but can't auth
21.06.2012   CO   4   Solving problem with authorization // In progress. Webauth started, but can't auth
22.06.2012   CO   1   Solving problem with authorization // Solved. Need fix photo's request